NQS(Nexcon Quality Assurance System) 9 TOOLS

Nexcon Technology implements the field-oriented 9 TOOLS of NQS (Nexcon Quality Assurance System) which combines the 7 processes of
mass production quality assurance and 2 key operational management systems for source quality assurance.

Start/Middle/End Poducts managment

Goal

Pre-detecting production process changes in products and parts to minimize risks

Main Points

The process will be carried out by an exclusive quality assurance team to check the models before the production day starts
To check the first parts/products of good quality on production lines to follow up with the check list after breakfast, lunch and dinner times

CTQ PROCESS MANAGEMENT

Goal

Pre-detecting production process changes in products and parts to minimize risks

Main Points

Self-management process to record CTQ process on QC charts
Identify and manage CTQ process and manage SPC 2~3 times per day
The Operator of the process manages the records (Manufacturing production self-inspection)

PRODUCTION PATROL

Goal

To detect potential defects and to correct the production management systems (Including CTQ process)

Main Points

The process will be carried out by an exclusive quality assurance team to check the complete beginning to final process once a day with the patrol sheet
Verify the process facilities and working conditions to make sure management meets all the standards

Process monitoring

Goal

To conduct a defect rate trend management system to check all abnormalities to improve relevant Lots and prevent defects

Main Points

The process will be carried out by an exclusive quality assurance team
For the defects found during the inspection process, draw a lower bound on the ±3 sigma range and read the process changes and implement the P chart management system to be carried out to improve on defects (Proactive defects prevention)

Same day repair analysis system

Goal

To gain feed back through rapid analysis of process defects

Main Points

Defects found on the same day will be immediately analyzed and repaired through CAPA
Defects found on the same day will be immediately analyzed and repaired through CAPA

AUDIT management system

Goal

To conduct routine internal inspections to promote effectiveness, efficiency and continuous improvements

Main Points

The process will be carried out by an exclusive quality assurance team to focus the AUDIT on improvements than evaluations (Should not be a formal assessment for scores)
Periodically evaluate and follow up with internal AUDIT CHECK LIST

RoHS operation management

Goal

To ensure proactive management of environmental regulatory substance detection of products by utilizing XRF equipment operations and ICP DATA Management

Main Points

The process will be carried out by an exclusive quality assurance team to secure procedures for processing Eco-friendly regulatory substances, establish and implement periodic analysis plans
RoHS: Use XRF Equipment and ICP DATA Management to analyze as mush as possible to pre-detect harmful substances

Outsource quality control

Goal

To maintain the stabilized quality of products for outsourced parts and contractors

Main Points

Establish a mass-production information sharing system for new models and set up quality performance of outsourcing process FEED BACK
Establish a guidance system to strengthen regular QPA detection and outsourced company's own detection system
Secure element technology through collaborative improvement guidance on WORST-3 defects

Testing power improvement

Goal

To maintain above target standards of inspectors and inspection equipment's detection capabilities

Main Points

Obtain company's self-inspection certification process and periodically evaluate compliance and take follow-up measures
LEVEL-UP of existing employees and equipment by performing own systematic evaluations
Periodically evaluate the detecting powers of inspection equipments (SPI, AOI, ICT, Funtional testing equipment)


CEO: Jun-Yeol YounTEL : +82-41-620-4000FAX : +82-41-620-4284
ADDRESS : Choongchung Nam-Do Chun-An City Seobuk-Gu Sungho-Eup Sukmun-Gil (Yobang-Ri 303-1)
BUSINESS NO : 608-88-00122E-MAIL : sales@nexcontech.com

Customer Service

Copyright © 2021 NEXCON Technology Co.,ltd. All Rights Reserved.